Adam Matériaux presents below various tutorials concerning the assembly steps of the facade and plastering system by Adam Matériaux.
This system includes the different phases necessary to create a durable, aesthetically pleasing facade that is properly protected against the elements.
Carefully review each step presented in the various blogs below.
Each step is explained in detail, with a list of the materials and equipment needed to complete your project correctly.
Feel free to place your order directly on our website, carefully checking the materials and equipment needed at each stage!
It's simple, quick and convenient. Furthermore, quantity discounts are automatically applied based on the quantities ordered.
Do you have a question or would you like some advice?
📧 Send us an email: contact@adammateriaux.be
📞 Call us for free: 0800 18 089
Preparation of Adam MatériauxGrey Adhesive: Adam Matériaux grey adhesive must be prepared according to the manufacturer's technical specifications. Pour the manufacturer's recommended quantity of clean water (between 5 and 5.5 liters) into a clean container, then gradually add...
Installing the PZA aluminum threshold with the 7016 end cap pair: To begin, you must ensure that the top of the Adam Matériaux EPS insulation is 20mm from the bottom of the frame. Use the Kubala 0344 or 0343 rasp to position...
Bonding Adam Matériaux EPS insulation around the frames: At the right angles of the frames, the Adam Matériaux graphite EPS panels will be bonded in an "L" shape to ensure continuous insulation around the openings and prevent any...
Installation of compression seals against the LS-VH06 frame angles and on the vapor barrier seals: After installing the LS-VH06 frame angles and the Litol-Tec vapor barrier seals, you must now proceed to install the compression seals. The seals...
Installation of vapor barrier seals between the window frames and the facade walls: Before installing the compression seals, a Lifol-tec vapor barrier will be installed at the junction between the window frames and the facade walls, on the...
Installation of LS-VH06 frame corner brackets on fixed frames: Before installing the LS-VH06 frame corner brackets, the surfaces of the fixed frames must be thoroughly cleaned, dry, and free of dust, dirt, grease, or any other element that could compromise adhesion...
It is important to thoroughly clean the frames before installing the LS-VH06 corner brackets to ensure good adhesion and optimal fixing
It is important to cut off the PUR foam that protrudes between the frames and the facade walls, in order to allow for the subsequent installation of a vapor barrier seal over the PUR foam
Aluminum starter angles for EPS insulation – Adam MatériauxInstallation of exterior thermal insulation on a facade using 140 mm thick Adam Matériauxgraphite-enhanced EPS panels. Aluminum starter angles: Installation of angle brackets...
PVC starter corner brackets for EPS insulation – Adam MatériauxInstallation of exterior thermal insulation on a facade using 140mm thick Adam Matériauxgraphite-enhanced EPS panels. PVC starter corner brackets: Installation of corner brackets...